Skip to content
Help centre

Why does the pack open as a draft in Runner?

The pack is marked as a draft until it is final: for an import, until Checkpoint B passes and the pack is issued; for an export, until it is issued and nothing blocks.

Quick answer

On the Pack tab, Draft pack means the pack opens with a draft watermark, and the reason is shown under it.

For an import, the reason is one of:

  • Checkpoint A has not run yet. or Checkpoint A is blocked.
  • Checkpoint B has not run: it needs the PAAR.
  • Checkpoint B has not passed yet. or Checkpoint B is blocked.
  • The pack has not been issued yet.

For an export:

  • Something still blocks the shipment.
  • The office has not issued the final pack yet.

Final pack means it is ready: for an import, Prepared for lodgement. The worksheets, with the documents index.

Good to know

Runner's import pack carries the worksheets and the documents index. Open each original from the Present tab. The fingerprint is shown under Open the pack.

Read next