The permit gate checks every line's HS code and origin against agency permit rules and the prohibition lists, at Checkpoint A and again at Checkpoint B. A prohibited line blocks the declaration.

2 min read · 1:08 video

Permits and prohibitions · 1:08Chapters and transcript

The permit gate checks every line against the agencies' permit rules and the import prohibition lists, by its HS code and its origin. It runs at Checkpoint A, before the Form M, and again at Checkpoint B, so a prohibited line is caught before the goods ship.

How it works

  1. For each line, Nohena matches the code against the rules in force on the declaration's rate date.
  2. Rules that turn on origin, such as the 2026 Import Prohibition List, are applied by each line's own origin. If a line's origin is not known, the rule applies.
  3. SONCAP applies by default to finished products, unless the goods are in an exempt class or NAFDAC, NAQS, NESREA or NMDPRA already regulates the line.
  4. At Checkpoint B, prohibitions found at Checkpoint A are carried forward for every line whose code has not changed.

What the outcomes mean

  • Prohibited: the line cannot be imported into Nigeria. The declaration is blocked until the line is removed.
  • Permit required: a certificate the importer must hold. Attach it on the Permits tab, and Nohena checks it against the line.
  • Conditional: the rule depends on something the code cannot show, such as whether the goods are used or in retail packs. Confirm whether it applies.

What you see

The Permits tab has one row per requirement, with the agency, the requirement, the lines it covers, the certificate and the status. On the overview, the Permits check reads as blocked when a line is prohibited, to review while a requirement is open, and in order when no rule applies or every certificate needed is attached and checked.

Good to know

If a radio or telecom item is coded outside the headings NCC type approval covers, Nohena still flags it for NCC, in case the code is wrong.

Nohena checks a certificate against the line and, where an agency publishes one, its public register. It never queries a government or customs system and does not certify a certificate. The agency issues the permit, and customs decide at the port.

Questions

Does a permit requirement block my declaration?

No. A required permit puts the Permits check in review until you attach the certificate. Only a prohibited line blocks the declaration.

Why did SONCAP appear on my goods?

SON's rule covers all finished commercial products except exempt classes, so Nohena applies SONCAP by default unless the goods are exempt or another agency regulates them.

When does the permit gate run?

At Checkpoint A, before the Form M, and again at Checkpoint B after the PAAR.