Credit quote
A credit quote is the sheet Nohena shows before a priced step runs, with the most it can cost in credits; accepting it holds the credits and nothing is charged before that.
A credit quote shows what a step will cost before it runs. The quote sheet lists each step with its credits and what it is based on, such as the number of documents or lines, a total when there is more than one step, Available now, Balance after, and the time the quote is valid until.
How it works
- Choose Accept to go ahead, or Not now to leave the consignment as it is.
- Accepting holds the quoted maximum, shown in the wallet under Held.
- The step is charged for what it actually worked on, never above the hold, and the rest returns.
- If the documents change before a step runs, open quotes are replaced and unused holds released.
Good to know
- A quote expires. After that, start the step again for a fresh quote, because prices and the exchange rate may have moved.
- Release the hold in the declaration header returns a hold in full for a step that has not started.
- Run all remaining quotes Checkpoint B and the declaration pack together once the PAAR is in; Checkpoint A always runs on its own.
- A re-run that qualifies for a lower price is marked on its line, and a step with exactly the same inputs as an earlier run returns that result and charges nothing.
- With too few credits, the Not enough credits sheet shows the shortfall; nothing is held or charged.
Questions
What is credit quote?
A credit quote is the sheet Nohena shows before a priced step runs, with the most it can cost in credits; accepting it holds the credits and nothing is charged before that. A credit quote shows what a step will cost before it runs. The quote sheet lists each step with its credits and what it is based on, such as the number of documents or lines, a total when there is more than one step, Available now, Balance after, and the time the quote is valid until.
Related terms
Sources
- Nohena Help Centre: Quotes, holds and charges nohena.com/help/quotes-holds-and-charges
Rules, rates and lists change. Nohena applies the version in force on the date of each check; confirm the current text with the body that owns it.